跳转到主内容

切回被否决—成功切回模拟后

Views:
1
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用场景

  • MetroCluster
  • 已否决切回
  • 切回模拟

问题描述

metrocluster switchback -simulate true 命令后、MetroCluster node show输出将报告切回被否决的状态。

ClusterA::> metrocluster node show
DR                               Configuration  DR
Group Cluster Node               State          Mirroring Mode
----- ------- ------------------ -------------- --------- --------------------
1     ClusterA
              ClusterA-01       configured     enabled  switchback vetoed
              ClusterA-02       configured     enabled  switchback vetoed
      ClusterB
              ClusterB-01       configured     enabled   waiting for switchback recovery
              ClusterB-02       configured     enabled   waiting for switchback recovery

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.