跳转到主内容

MetroCluster 切换命令在 9.5 或更高版本的 MetroCluster IP 上使用时间较长的原因是什么?

Views:
7
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

可不使用  

适用于

  • ONTAP 9.5 及更高版本
  • MetroCluster IP
  • 切换

解答

这是由于在[1]协商的切换工作流之后直接执行修复。此外、远程节点将不再停止、无需执行任何其他步骤即可执行切换。
有关详细信息,请参见《 MetroCluster 管理和灾难恢复指南》。
注意:切换过程本身所用的时间以及客户端影响保持不变。

ClusterA::> metrocluster  switchover

Warning: negotiated switchover is about to start. It will stop all the data
         Vservers on cluster "ClusterB" and automatically restart them on
         cluster "ClusterA".
Do you want to continue? {y|n}: y

[Job 669] Job is queued: MetroCluster Negotiated Switchover Job.              
[Job 669] Preparing the cluster for the switchover operation...               
[Job 669] Synchronizing cluster configuration from the remote cluster (attempt 1 of 30).[Job 669]
Job succeeded: Switchover is successful.
MetroCluster Auto Heal Job is running. Job ID is 670
Heal aggregates phase is in progress.                                         
Preparing for the heal root aggregates phase.                                 
Heal root aggregates phase is in progress.                                    
MetroCluster auto heal completed successfully.
ClusterA::>

其他信息