切回被否决—DR配对节点未就绪
适用场景
- MetroCluster
- 控制器升级
问题描述
- 切回操作已被否决、原因如下:
Cluster_A::> metrocluster operation show
Errors: Failed to validate the node and cluster components before the switchback operation.
Cluster_A:(non-overridable veto): The DR partner is not ready for the switchback operation. Contact technical support for assistance.
- 以下输出显示了集群级别和节点级别的MetroCluster 状态视图之间的差异:
Cluster_A::> metrocluster node show
DR Configuration DR
Group Cluster Node State Mirroring Mode
----- ------- ------------------ -------------- --------- --------------------
1 Cluster_A
Node1 configured enabled switchback vetoed
Cluster_B
Node2 configured enabled negotiated switchover completed
Cluster_A::> metrocluster show
Configuration: two-node-fabric
Cluster Entry Name State
------------------------------ ---------------------- ---------------------
Local: Cluster_A
Configuration State configured
Mode switchover
AUSO Failure Domain auso-on-cluster-disaster
Remote: Cluster_B
Configuration State configured
Mode waiting-for-switchback
AUSO Failure Domain auso-on-cluster-disaster