跳转到主内容

切回失败: " 接收器 " 流出错

Views:
2
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
metrocluster<a>1422074</a>
Last Updated:

适用场景

  • ONTAP 9
  • MetroCluster 
  • 头部升级

问题描述

在 MetroCLuster 设置中执行机头升级期间,切回可能会失败,并显示以下错误: 

::*> metrocluster operation show

       Operation: switchback
           State: failed
      Start Time: 8/20/2021 11:49:47
        End Time: 8/20/2021 11:59:42
          Errors: Failed to set up the node and cluster components for the switchback operation.
                  ClusterA (fatal): A stream operation timed out.
                  Error: Failed to sync configuration on cluster "ClusterB". Error on "receiver" stream: (Receiver Thread  
          failed to process baseline message on streamID <stream-id>. 
             Error: duplicate entry).

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.