跳转到主内容

由于切换操作在WAFL_PHASE 1_SO中挂起、导致节点崩溃

Views:
7
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster<a>2009年136057</a>
Last Updated:

适用场景

  • MetroCluster
  • FlexArray
  • E 系列

问题描述

  • 更换E系列端口上的SFP后出现多节点崩溃。 
PANIC: DR DRSOM_SSTBL_OP_SWITCHOVER Operation is Hung in WAFL_phase_1_SO in SK process drsom_watch
 
  • 切换仍处于部分状态: 
dvp501001::> metrocluster show
Configuration: fabric
Cluster             Entry Name        State
------------------------------ ---------------------- ---------------------
Local: ClusterA
                 Configuration State  configured
                         Mode  partial-switchover
                 AUSO Failure Domain  auso-on-cluster-disaster
Remote: ClusterB
                 Configuration State  not-reachable
                         Mode  -
                 AUSO Failure Domain  not-reachable

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.