跳转到主内容

MetroCluster IP 切换回退失败,ReceiverThread 无法处理基线

Views:
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用于

  • ONTAP 9.15.1P7
  • MetroCluster (MCC) IP
  • AFF-A400 平台

问题

  • 修复版本中针对缺陷 CONTAP-62147 的系统遇到了相同的症状。
  • MetroCluster 切换操作失败。
  • metrocluster operation showmetrocluster switchback-simulate 期间观察到错误:

Errors: Failed to setup the node and cluster components for the switchback operation.clusterA(fatal): A stream operation timed out. Error: Failed to sync configuration on cluster "clusterB". Error on "receiver" stream: (ReceiverThread failed to process baseline message on streamID. Error: duplicate entry).

  • MCC 配置复制重新同步被卡住(一个站点上的消息传递在另一个站点上失败)。metrocluster check show 显示配置复制和集群的警告。

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.