双节点MetroCluster 协商切换vetocheck_locked
适用场景
- 双节点MetroCluster FC
 - ONTAP 9
 
问题描述
- 成功切换和切回 
metrocluster switchover -simulate true失败后、显示消息: 
Job failed: Failed to validate the node and cluster components before the switchover operation. Use the "metrocluster operation show" command to view detailed error information. Resolve the errors, then try the command again.
metrocluster operation show输出显示:
CL01::CL01-N01 (non-overridable veto): Cannot perform this operation while this node is in switched over state, verify the node is in normal mode by running "metrocluster node show" and retry the operation again
metrocluster switchback -simulate true失败并显示消息:
Info: Switchback not needed. There are no aggregates or disks belonging to the DR partner cluster on the local cluster.
metrocluster node show输出显示:
DR                          Configuration      DR
 Group     Cluster
                         Node         State          Mirroring     Mode
 ----- ------- ------------------ -------------- --------- --------------------
 1
           CL01
                         CL01-N01          configured       enabled      negotiated switchover vetocheck_locked
           CL02
                        CL02-N01          configured       enabled      negotiated switchover vetocheck_locked