跳转到主内容

MetroCluster 切换失败—AutoSupport 消息

Views:
11
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用场景

  • MetroCluster
  • ONTAP 9
  • 切换失败
  •  callhome.mcc.switchover.failed:EMERGENCY 

事件摘要

如果MetroCluster 切换操作失败、则会显示此消息。故障可能为部分或完整。

验证

事件日志

event log show -event *switchover*

命令行:

在尝试执行切换操作的集群上运行以下命令。

metrocluster operation show

Operation: switchover
State: failed
Start Time: xxx
End Time: xxx
Errors: Failed to validate the node and cluster components before the switchover operation.
xxx(non-overridable veto): <Failure reason>

解决方法

  1. 验证MetroCluster 的当前状态

metrocluster node show

  1. 检查SVM是否联机:

vserver show

  1. 按照MetroCluster operation show输出中所述的恢复步骤进行操作。
  2. Please contact NetApp Technical Support or log into the NetApp Support Site to create a case. Reference this article for further assistance.

追加信息

注意: MetroCluster operation show输出仅会报告上次MetroCluster 操作。如果在切换失败后运行了后续MetroCluster 操作、则输出将与故障无关。

要获取有关先前MetroCluster 操作的更多详细信息、请执行以下操作:

  1. 运行MetroCluster operation history show命令查看所有先前的MetroCluster 操作:

metrocluster operation history show -fields operation,start-time,state,operation-uuid

  1. 在输出中、确定失败或部分失败操作的operation-uuid:

ClusterA::> metrocluster operation history show -fields operation,start-time,state,operation-uuid
operation-uuid                       operation           start-time         state
------------------------------------ ------------------- ------------------ ----------
b6fe95a4-dc12-11ec-881e-00a0985bd305 switchover-simulate mm/dd/yyyy hh:mm:ss successful
bffaf8b3-b9a4-11ec-881e-00a0985bd305 switchover-simulate mm/dd/yyyy hh:mm:ss successful
d719de7e-5a23-11ea-93d9-00a0985bd305 switchover          mm/dd/yyyy hh:mm:ss failed
2f258258-59b4-11e9-b2d2-00a0985bd305 switchover          mm/dd/yyyy hh:mm:ss completed-with-manual-recovery-needed

  1. 使用已标识的操作uuid运行MetroCluster operation history show命令:

metrocluster operation history show -operation-uuid <operation-uuid>

ClusterA::> metrocluster operation history show -operation-uuid d719de7e-5a23-11ea-93d9-00a0985bd305
      Operation: switchover
          State: failed
         Errors: Failed to validate the node and cluster components before the switchover operation.
                 ClusterA::siteA-02 (non-overridable veto): DR partner NVLog mirroring is not online. Make sure that the links between the two sites are healthy and properly configured.
           Node: -
     Start Time: mm/dd/yyyy hh:mm:ss
       End Time: mm/dd/yyyy hh:mm:ss
         Job ID: 19643
 Operation UUID: d719de7e-5a23-11ea-93d9-00a0985bd305
   Command Line: metrocluster switchover
Additional Info: -

 

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.