运行"switchback -simulate "后、作业仍在进行中
适用场景
MetroCluster系统
问题描述
- MetroCluster切回模拟作业停留在
in-progress
状态 - 任何后续MetroCluster打印作业失败、并出现以下消息:
Error: command failed: This MetroCluster operation cannot be run because another "switchback" operation is currently in progress. Run "metrocluster operation history show -job-id 4321 -instance" to view the status of the currently running operation.
Cluster_A::> metrocluster operation history show -job-id 4321 -instance
Operation: switchback-simulate
State: in-progress
Errors: -
Node: Cluster_A-01
Start Time: 4/9/2022 09:44:14
End Time: -
Job ID: 4321
Operation UUID: 9a1011ba-b5f9-11ea-c726-00a098e01597
Command Line: metrocluster switchback -simulate true
Additional Info: -