由于对数据服务器执行了"volume效率"命令、ONTAP升级到9.14.1Px已暂停
适用场景
- ONTAP升级到9.14.1 Px
- MetroCluster
问题描述
- 由于切换被否决、MetroCluster上的ONTAP升级已暂停:
::> cluster image show-update-progress
Estimated Elapsed
Cluster Duration Duration Status
------------------------------ --------------- --------------- ----------------
cluster01 XX:XX:XX XX:XX:XX completed
cluster02 XX:XX:XX XX:XX:XX paused-on-error
Details: Switchover paused.
metrocluster operation show
报告切换尝试失败:
[Job XXXX] Job failed: Failed to validate the node and cluster components before the switchover operation. Use the "metrocluster operation show" command to view detailed error information. Resolve the errors, then try the comman again.
metroclsuter vserver show
报告降级的数据SVserver:
::> metrocluster vserver show
Cluster: cluster02
Partner Configuration
Vserver Vserver State
------------------- ---------------------- -----------------
svm01 svm01-mc degraded
Corrective Action: Resynchronize the configuration using "metrocluster vserver resync" command. Contact technical support for assistance if configuration-state does not change to healthy.
- 受影响的Vserver 具有安全访问控制角色的卷效率条:
::> security login role show -vserver * -role * -cmddirname "volume efficiency"*