无法验证来自DR配对节点的定期消息
适用场景
- ONTAP 9
- 延伸型 MetroCluster
问题描述
在MetroCluster 切换后、切回和切回模拟失败:
Failed to validate the node and cluster components before the switchback operation.
ClusterA-01::ClusterA-01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.