双节点MetroCluster —升级期间切换失败
适用场景
- 双节点MetroCluster
- 升级期间切换停止
- ONTAP- < 9.3P13
- < 9.4P7
- 小于9.5P3
 
问题描述
升级双节点MetroCluster 期间、切换失败。
clusterA::> metrocluster node show
 DR                               Configuration  DR
 Group Cluster Node               State          Mirroring Mode
 ----- ------- ------------------ -------------- --------- --------------------
 1     clusterA
               nodeA-1       configured     enabled   negotiated switchover incomplete
       clusterB
               nodeB-1       configured     enabled   negotiated switchover pre-commit completed