由于交换机ISL关闭、切回被否决
适用场景
- 光纤 MetroCluster
- ONTAP 9
问题描述
- 无法切回、并且切回失败并显示错误
示例:
ClusterA::> metrocluster switchback
Warning: switchback is about to start. It will stop all the switched over data Vservers on cluster "ClusterA" and automatically restart them on cluster "ClusterB".
Do you want to continue? {y|n}: y
[Job 3408] Aborting the switchback operation...
[Job 3408] Job failed: Failed to validate the node and cluster components before the switchback operation. Use the "metrocluster operation show" command to view detailed error information. Resolve the errors, then try the command again.
ClusterA::> metrocluster operation show
Operation: switchback
State: failed
Start Time: 6/13/2023 14:25:54
End Time: 6/13/2023 14:26:31
Errors: Failed to validate the node and cluster components before the switchback operation.
ClusterA::ClusterB (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.
- MetroCluster互连show显示状态"UP (启动)"
示例:
ClusterA::> metrocluster interconnect show
Mirror Mirror
Partner Admin Oper
Node Partner Name Type Status Status Adapter Type Status
---- ------------ ------- -------- ------- ------- ------ ------
ClusterA-01
ClusterB-01 DR disabled offline fcvi_device_0
FC-VI Up
fcvi_device_1
FC-VI Up