由于"DR配对节点未就绪"、在机头交换期间切回失败
- Views:
- Visibility:
- Public
- Votes:
- 0
- Category:
- metrocluster
- Specialty:
- metrocluster<a>2009983389</a>
- Last Updated:
适用场景
- 光纤 MetroCluster
- ONTAP 9
- 从FAS9000切换到FAS9500的HeadSwap
问题描述
- 在头交换过程中、切回操作失败、原因:
Errors: Failed to validate the node and cluster components before the switchback operation.ClusterA::NodeA (non-overridable veto): The DR partner is not ready for the switchback operation. Contact technical support for assistance.