切回失败: " 接收器 " 流出错
适用场景
- ONTAP 9
- MetroCluster
- 头部升级
问题描述
在 MetroCLuster 设置中执行机头升级期间,切回可能会失败,并显示以下错误:
::*> metrocluster operation show
Operation: switchback
State: failed
Start Time: 8/20/2021 11:49:47
End Time: 8/20/2021 11:59:42
Errors: Failed to set up the node and cluster components for the switchback operation.
ClusterA (fatal): A stream operation timed out.
Error: Failed to sync configuration on cluster "ClusterB". Error on "receiver" stream: (Receiver Thread
failed to process baseline message on streamID <stream-id>.
Error: duplicate entry).