跳转到主内容

升级机头后、MetroCluster 不会切回

Views:
3
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster<a>2009年444408.</a>
Last Updated:

适用场景

  • ONTAP 9.10.1及更高版本
  • MetroCluster FC
  • 控制器升级

问题描述

控制器升级操作步骤 期间切回失败:
 
ClusterA::*> metrocluster operation show
    Operation: switchback-simulate
      State: failed
    Start Time: 1/21/2023 14:40:47
     End Time: 1/21/2023 14:41:25
      Errors: Failed to validate the node and cluster components before the switchback operation.
          damc2d1::damc2d1-01 (non-overridable veto): The DR partner is not ready for the switchback operation. Contact technical support for assistance.
          damc2d1::damc2d1-02 (non-overridable veto): The DR partner is not ready for the switchback operation. Contact technical support for assistance.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.