跳转到主内容

MetroCluster升级停滞:无法检查是否存在不一致的卷。原因:操作无效

Views:
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
MetroCluster
Last Updated:

适用场景

  • 通过切换/切回进行ONTAP升级
  • 双节点MetroCluster
  • ONTAP 9.12.1

问题描述

  • ONTAP从9.12.1P10或更早版本升级到9.12.1P11
  • 需要将未升级的节点切换到已升级的节点、但操作会失败

示例:

Failed to validate the node and cluster components before the switchover operation.

(non-overridable veto): Internal Error. Failed to check for inconsistent volumes. Reason: invalid operation.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.