跳转到主内容

在对站点进行物理重新定位后、MetroCluster切回被否决

Views:
4
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
HW
Last Updated:

适用场景

  • MetroCluster
  • ONTAP 9

问题描述

  • 在对MetroCluster的一个站点进行物理重新定位后、尝试执行切回失败、并显示以下内容:

netapp-metro1::> metrocluster operation show
    Operation: switchback
      State: failed
    Start Time: 11/28/2024 12:51:15
     End Time: 11/28/2024 12:51:53
      Errors: Failed to validate the node and cluster components before the switchback operation.
          netapp-metro1::netapp-metro1-01 (non-overridable veto): Unable to communicate with the remote cluster in order to transmit mirror information. Wait a few minutes, and try the command again. For further assistance, contact technical support.
          netapp-metro1::netapp-metro1-01 (non-overridable veto): Communication error occurred. Verify that cluster peer connectivity is healthy by running "cluster peer show" and retry the operation.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.