跳转到主内容

MetroCluster IP:无法验证来自DR配对节点的定期消息

Views:
7
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用场景

  • MetroCluster IP
  • ONTAP 9
  • 共享ISL基础架构

问题描述

尝试执行切回操作时、会出现以下错误
 
 
示例:

 

ClusterA::*> metrocluster operation show Operation: switchback State: failed Start Time: 12/28/2022 15:13:18 End Time: 12/28/2022 15:13:53 Errors: Failed to validate the node and cluster components before the switchback operation. ClusterB::ClusterB-02 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support. ClusterB::ClusterB-01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.