跳转到主内容

MetroCluster IP机箱温度关闭MAUSO

Views:
6
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用场景

  • MetroCluster IP
  • ONTAP调解器
  • ONTAP 9.12.1 (及更早版本)
  • 收到机箱过热关闭AutoSupport
  • 收到机箱温度过低关闭AutoSupport

问题描述

  • 由于机箱温度过高/过低、一个站点中的MetroCluster IP节点关闭
  • 不会发生调解器辅助的自动计划外切换(MAUSO)

Cluster1::> metrocluster operation show
Operation: switchover
State: failed
Start Time: mm/dd/yyyy
End Time: mm/dd/yyyy

 

Errors: Failed to validate the node and cluster components before the switchover operation.
Cluster1::node-01 (non-overridable veto): Automatic Unplanned Switchover could not be performed as one of the prechecks failed. Run "event log show -message mcc.auso.trigFailed" to view the errors that occurred. Verify Automatic Unplanned Switchover is enabled on both nodes by using the "metrocluster node show" command. Use the "metrocluster switchover -forced-on-disaster true" command to switchover the DR-site storage manually.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.