跳转到主内容

MetroCluster切换失败

Views:
4
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用场景

  • MetroCluster IP
  • ONTAP 9

问题描述

  • 启动协商切换(NSO)后、操作失败并显示错误消息
示例:
Cluster_A::> metrocluster operation show

    Operation: switchover
      State: successful
    Start Time: 5/24/2023 06:35:38
     End Time: 5/24/2023 06:35:44
      Errors: Failed to execute the switchover operation for the node components. Cluster_A (fatal): Unable to determine the result of the negotiated switchover operation for the remote nodes. Ensure the remote nodes are shut down and then retry the switchover operation with the "-forced-on-disaster true" option.
 
  • MetroCluster处于不一致状态
示例:
Cluster_A::> metrocluster node show
DR                 Configuration  DR
Group Cluster Node         State      Mirroring Mode
----- ------- ------------------ -------------- --------- --------------------
1    Cluster_A
        node_A_1       configured    enabled  negotiated switchover incomplete
        node_A_2       configured    enabled  negotiated switchover incomplete
    Cluster_B
        node_B_1       configured    enabled   negotiated switchover completed
        node_B_2       configured    enabled   negotiated switchover completed

Cluster_A::> metrocluster show

Configuration: IP-fabric

Cluster             Entry Name        State
------------------------------ ---------------------- ---------------------
Local: Cluster_A
                 Configuration State   configured
                         Mode   normal
                 AUSO Failure Domain   auso-on-cluster-disaster
Remote: Cluster_B
                 Configuration State   configured
                         Mode   normal
                 AUSO Failure Domain   auso-on-cluster-disaster

  • Aggrs已切换、但配置未切换

示例:

Cluster_A::> aggr show
...

Cluster_B Switched Over Aggregates:
Aggregate    Size Available Used% State   #Vols  Nodes       RAID Status
--------- -------- --------- ----- ------- ------ ---------------- ------------
aggr3_node_B_1
      355.5GB   334.2GB   6% online     3 node_A_1      raid_dp,
                                  mirrored,
                                  normal

 

  • 在执行NSO操作之前、切换模拟已成功完成、只需几秒钟/几分钟

示例:

Cluster_A::> met op show
  (metrocluster operation show)
    Operation: switchover-simulate
      State: successful
    Start Time: 5/24/2023 06:35:08
     End Time: 5/24/2023 06:35:24
      Errors: -

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.