跳转到主内容
NetApp Knowledge Base site will be down for 3 hours between Oct 26, 23:59 PST and Oct 27, 02:59 PST, for system maintenance and infrastructure update.

协商切换后节点是否会自动暂停?

Views:
1
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
MetroCluster
Last Updated:

适用场景

  • MetroCluster IP
  • 光纤 MetroCluster
  • 延伸型 MetroCluster
  • ONTAP 9

问题解答

问题解答取决于您的配置:
 
MetroCluster类型 协商切换后的结果(NSO)
MetroCluster IP (ONTAP 9.5及更高版本) 灾难站点上的节点 不会 暂停
MetroCluster IP (ONTAP 9.4及更低版本) 灾难站点上的节点暂停
光纤 MetroCluster 灾难站点上的节点暂停
延伸型 MetroCluster 灾难站点上的节点停止
NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.