跳转到主内容

CONAP-412042:从AFF A90执行MetroCluster扩展/技术更新/过渡时的问题描述

Views:
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
metrocluster
Last Updated:

问题描述

在从AFF-A90源平台执行MetroCluster IP扩展/TechRefresh/TranstiTION期间,执行“MetroCluster configure-settings connection connect”后报告以下错误:
clusterA::(star)> metrocluster configuration-settings  connection connect
Do you want to continue? {y|n}: y
[Job 24079] Preparing the connections between the partner nodes from the local cluster.[Job 24079] Job failed: Failed to prepare the network addresses for home port "e1b" on node "node-A90" in cluster "clusterA". Reason: failed to set field "filer" to "node-A90"
Use the "metrocluster operation show" command to view detailed error information. Resolve the errors, then try the command again.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.