跳转到主内容

在机头交换过程中无法执行切回

Views:
22
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用于

  • 双节点 MetroCluster 机头升级
  • 从 AFF8040 到 AFF300
  • 切换状态

问题

在升级第一个节点期间,无法执行 MetroCluster 切回

Failed to validate the node and cluster components before the switchback operation.
(non-overridable veto): The DR partner is not ready for the switchback

MetroCluster node show 报告新节点处于正常状态,而不是等待切回

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.

 

  • 这篇文章对您有帮助吗?