跳转到主内容

目标节点重新启动后, 7MTT 初始化失败

Views:
18
Visibility:
Public
Votes:
0
Category:
7-mode-transition-tool
Specialty:
dp
Last Updated:

适用于

  • ONTAP 9
  • 7-模式过渡工具 (7MTT)。

问题

  • 手动重新启动控制器后,所有 7MTT SnapMirror 作业均消失
  • 重新创建的关系失败,并显示错误:

Failed to fetch status information for volume "Dest_SVM:Dest_Volume". The failure can be attributed to either the volume being restricted, offline, infrastructure timeouts or memory allocation failures. (An operation gathering information on the relationship with destination "Dest_SVM:Dest_Volume" failed.)    

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.