跳转到主内容

切回失败、原因是"The operation timed out while waing for Vserver configuration synchronation to complete"(操作在等待Vserver配置同步完成时超时)

Views:
22
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster<a>切回</a><a>1092644</a>
Last Updated:

状态信息

适用场景

  • ONTAP 9
  • MetroCluster

问题描述

metroclsuter switchback (或 switchback -simulate true) 由于正在进行Vserver配置重新同步而失败:

ClusterA::> metrocluster operation show

Operation: switchback
State: failed
Start Time: 1/20/2019 13:00:01
End Time: 1/20/2019 13:02:58
Errors: Failed to validate the node and cluster components before the switchback operation.
ClusterA (non-overridable veto): The operation timed out while waiting for Vserver configuration synchronization to complete.
   Vserver resynchronization is continuing in the background.
   Run "metrocluster vserver show -cluster ClusterB" on both clusters, wait until the "Configuration State" of all Vservers is "healthy", and then retry the operation.
   Contact technical support for assistance if any Vserver remains unhealthy as indicated by a "Configuration State" shown as "degraded" or "unhealthy".

 

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.