跳转到主内容

MetroCluster IP在升级RC框架 后无法切回

Views:
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster<a>2009年388537</a>
Last Updated:

适用场景

  • ONTAP 9
  • 基于 IP 的 MetroCluster
  • RCF

问题描述

  • 在一个站点升级两个交换机后、MetroCluster IP中的切回无法正常工作。
  • 切回失败后出现以下错误
Errors: Failed to validate the node and cluster components before the switchback operation.
Cluster01 (non-overridable veto): Verify connectivity to the remote site. For fabric configurations, make sure that the Inter-Switch Links are up.
Cluster01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.