MetroCluster IP在升级RC框架 后无法切回
- Views:
- Visibility:
- Public
- Votes:
- 0
- Category:
- metrocluster
- Specialty:
- metrocluster<a>2009年388537</a>
- Last Updated:
适用场景
- ONTAP 9
- 基于 IP 的 MetroCluster
- RCF
问题描述
- 在一个站点升级两个交换机后、MetroCluster IP中的切回无法正常工作。
- 切回失败后出现以下错误
Errors: Failed to validate the node and cluster components before the switchback operation.Cluster01 (non-overridable veto): Verify connectivity to the remote site. For fabric configurations, make sure that the Inter-Switch Links are up.Cluster01 (non-overridable veto): Unable to validate periodic message from DR partner node. This might be due to misconfigured interconnect. Use "metrocluster interconnect show" command and verify states of all connections is up. Retry the operation. If failure persists, contact support.