跳转到主内容

集群端口上的链路已关闭

Views:
11
Visibility:
Public
Votes:
0
Category:
fabric-interconnect-and-management-switches<a>2009-398685</a>
Specialty:
hw
Last Updated:

适用场景

  • ONTAP 9
  • 有交换机集群
  • Cisco N3K-C322C/N3K-C3132Q-V

问题描述

  • IN EMS 端口关闭、LIF迁移到正常运行的端口

Wed Dec 07 14:26:25 +0100 [node-1: kernel: netif.linkDown:info]: Ethernet e3b: Link down, check cable.
Wed Dec 07 14:26:28 +0100 [node-1: vifmgr: vifmgr.portdown:notice]: A link down event was received on node node-1, port e3b.
Wed Dec 07 14:26:28 +0100 [node-1: vifmgr: vifmgr.clus.linkdown:EMERGENCY]: The cluster port e3b on node node-1 has gone down unexpectedly.
Wed Dec 07 14:26:28 +0100 [node-1: vifmgr: vifmgr.portdown:notice]: A link down event was received on node node-1, port e3b.
Wed Dec 07 14:26:28 +0100 [node-1: vifmgr: vifmgr.lifmoved.linkdown:notice]: LIF node-1_clus2 (on virtual server 4294967293), IP address 169.254.223.95, is being moved to node node-1, port e3a.
Wed Dec 07 14:26:28 +0100 [node-1: vifmgr: vifmgr.lifsuccessfullymoved:notice]: LIF node-1_clus2 (on virtual server 4294967293), IP address 169.254.223.95, is now hosted on node node-1, port e3a.
Wed Dec 07 14:26:39 +0100 [node-1: vifmgr: vifmgr.reach.noreach:notice]: Network port e3b on node node-1 cannot reach its expected broadcast domain Cluster:Cluster. No other broadcast domains appear to be reachable from this port.
Wed Dec 07 14:26:39 +0100 [node-1: vifmgr: vifmgr.reach.skipped:notice]: Network port e3b on node node-1 was not scanned for reachability because it was administratively or operationally down at the time of the scan.

  • 在中 show tech-support

2022 Dec 07 13:12:08.659576: (null)stp_ethpm_complete_port_logical_cleanup(): EthPM logical cleanup for port Eth1/7 complete with status 0x0
2022 Dec 07 13:12:08.635574: (null)stp_port_logical_cleanup_delete_vlan_ports(1722): EthPM logical down for port Eth1/7 vlans 1
2022 Dec 07 13:12:08.633071: (null)stp_common_im_protocol_state_change_handler(): IM L2 Port Proto DOWN Notif : port_mode 0x80000, speed 100000, duplex 2, primary 1, port Eth1/7, vlans 1,

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.