由于手动 ONTAP 升级期间的 WAFL/RAID 标签,接管失败
适用于
- ONTAP 9
- 手动无中断 ONTAP 升级
问题描述
- 在 ONTAP 升级期间,在第一个节点更新后出现以下错误:
Takeover is not possible: The version of software running on each node of the SFO pair is incompatible, NVRAM log not synchronized
- 尝试使用 allow-version-mismatch 选项进行接管失败,并显示以下错误:
Error: command failed: Failed to initiate takeover. Reason: partner versions of WAFL and/or RAID are newer than this node.