ONTAP升级已暂停、任务为"YD的集群日志转发升级/还原任务"
适用场景
- ONTAP 9
- 自动化无中断升级(ANDU)
- 发生错误时暂停
问题描述
更新后验证失败、并显示以下错误:
::*> system node upgrade-revert show -node node-01
Node: node-01 Status: aborted
Status Message: The upgrade aborted in the "post-apps" phase on task "Cluster Log Forwarding Upgrade/Revert Task for YD". Contact support personnel for the upgrade repair procedure.
Vers Phase Status Upgrade Phase Status Message
---- ---------- -------- ------------------------------------------------------
2000 pre-root applied No upgrade is required for this phase.
2000 pre-apps applied Upgrade successful.
2000 post-apps aborted Cannot connect to destination host log.sys.domain, port 514 from node "node-01". Reason: Failed to connect: Connection refused. Verify connectivity to desired host or skip the connectivity check with the "-force" parameter.
::*>