跳转到主内容

由于“验证详细信息”任务,控制器更换作业在机头更换完成后显示为“已暂停”

Views:
211
Visibility:
Public
Votes:
0
Category:
fas-systems
Specialty:
core
Last Updated:

适用于

  • ONTAP 9
  • 头部升级
  • 更换控制器

问题

  • 机头升级后, job show 显示 Controller-replacement job - Paused,即使 system controller replace show 报告 Completed:

::*> system controller replace show
Node             Status                   Error-Action
----------------
------------------------ ------------------------------------
Node01        Completed
Node02        Completed

::*> job show
...
106251 Controller-replacement node-01 Node01       Paused
       Description: Controller-replacement job.

106254 Controller-replacement node-01 Node02       Paused
       Description: Controller-replacement job.

  • EMS 日志:

[Node01: mgwd: ndo.cr.paused.userInput:notice]: Controller replacement operation has been paused on node "Node01" in "Verify Details" task during "Postcheck" phase for operator intervention.

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.