CONTAP-429937:ANDU 到 9.16.1 在 SnapMirror 9.16.1 升级/还原任务中中止
问题描述
ANDU 到 9.16.1 在 SnapMirror 9.16.1 升级/还原任务中中止:Cluster1::*> system node upgrade-revert show -node strmcb01
Node: Cluster1-01 Status: aborted
Status Message: The upgrade aborted in the "post-apps" phase on task "SnapMirror 9.16.1 Upgrade/Revert Task". Contact support personnel for the upgrade repair procedure.
Vers Phase Status Upgrade Phase Status Message
---- ---------- -------- ------------------------------------------------------
2000 pre-root applied No upgrade is required for this phase.
2000 pre-apps applied Upgrade successful.
2000 post-apps applied Upgrade successful.
2200 pre-root applied No upgrade is required for this phase.
2200 pre-apps applied Upgrade successful.
2200 post-apps applied Upgrade successful.
2400 pre-root applied No upgrade is required for this phase.
2400 pre-apps applied Upgrade successful.
2400 post-apps applied Upgrade successful.
2800 pre-root applied No upgrade is required for this phase.
2800 pre-apps applied Upgrade successful.
2800 post-apps aborted entry doesn't exist
12 entries were displayed.