CONTAP-383134:由于 EKM,切换失败
问题描述
- 正在使用外部密钥管理器(EKM)。
 - 切换或切换模拟因加密问题而失败:
 
::> metrocluster operation show
 Operation: switchover-simulate
 State: failed
 Start Time: <date & time>
 End Time: <date & time>
 Errors: Failed to validate the node and cluster components before the switchover operation.
 Cluster_Name (fatal): Processing Subsystem (SO Check KMIP configuration is in sync between local and remote cluster) encountered an unknown error.
- 所有节点都有合适的密钥服务器,可用于 
security key-manager external show-status