跳转到主内容

在集群网络端口上检测到 vifmgr.clus.linkdown,更换 SFP 无法解决此问题

Views:
101
Visibility:
Public
Votes:
0
Category:
ontap-9
Specialty:
hw
Last Updated:

适用于

  • ONTAP 9.x
  • FAS 系统
  • AFF 系统

问题

  • 在事件日志中为集群网络端口报告了 vifmgr.clus.linkdown
示例:
[node-02: ixgbe/e0b: snmp.link.down:info]: Interface 2 is down.
[node-02: ixgbe/e0b: netif.linkDown:info]: Ethernet e0b: Link down, check cable.
[node-02: vifmgr: vifmgr.portdown:notice]: A link down event was received on node node-02, port e0b.
[node-02: vifmgr: vifmgr.clus.linkdown:EMERGENCY]: The cluster port e0b on node node-02 has gone down unexpectedly.
  • 即使在更换 FAS 端和集群网络交换机端的 SFP 后,网络端口仍处于关闭状态。
  • FAS 端新 SFP 的序列号在 sysconfig -a 的输出中正确显示。
  • 网络电缆无故障。
  • 当电缆连接到交换机的另一个端口时,网络端口链路启动。

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.