跳转到主内容

在FAS25xx系统上、多个风扇发生故障并关闭系统

Views:
14
Visibility:
Public
Votes:
0
Category:
fas-systems<a>2009年471361</a>
Specialty:
hw
Last Updated:

适用场景

FAS25xx系统

问题描述

  • 系统在启动几分钟后关闭
  • EMS

[node-01:monitor.globalStatus.critical:EMERGENCY]: Controller failover of NSH-FAS-01 is not possible: Controller Failover takeover disabled. Disk shelf fault.
[node-01:monitor.fan.critical:EMERGENCY]: 2 fans have failed. Replace them to avoid overheating. If not corrected, system will shutdown in 2 minutes.
[node-01:callhome.fans.failed:EMERGENCY]: Call home for MULTIPLE FAN FAILURE
[node-01:monitor.globalStatus.critical:EMERGENCY]: Controller failover of NSH-FAS-01 is not possible: Controller Failover takeover disabled. Multiple fans has failed. Power Supply Status Critical: PSU1. Disk shelf fault.

  • 对PSU风扇进行物理检查后、表明其状态为"静止"

 

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.