跳转到主内容

在FAS8080到FAS9000头插拔后无法切回

Views:
6
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
MetroCluster
Last Updated:

适用场景

  • FAS8080
  • FAS9000
  • Fabric MetroCluster
  • ONTAP 9

问题描述

切回失败、并显示以下错误:
Error: failed to validate the node and cluster components before the switchback operation.
operation timed out while waiting for Vserver configuration synchronization to complete.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.