跳转到主内容

搜索

正在以下范围内搜索:
关于 1 个结果
  • https://kb-cn.netapp.com/on-prem/ontap/Ontap_OS/OS-Issues/CONTAP-166978
    问题描述 For controller upgrade, temporary 10GbE cluster connections with new nodes are required when the old nodes use 10GbE cluster ports. During a controller upgrade in a two-node switchless cluster, 1...问题描述 For controller upgrade, temporary 10GbE cluster connections with new nodes are required when the old nodes use 10GbE cluster ports. During a controller upgrade in a two-node switchless cluster, 10GbE e0a or e0b cluster ports on older AFF A300 or FAS8200 nodes might not link up when connected to 10/25GbE ports on newer AFF A70, AFF A90,AFF A1K, FAS70 or FAS90 nodes.