跳转到主内容

工作负载大幅增加后, ONTAP FlexArray WAFL 挂起

Views:
31
Visibility:
Public
Votes:
0
Category:
v-series-flexarray
Specialty:
core
Last Updated:

适用于

  • ONTAP 9.x
  • E 系列

问题

  • WAFL 崩溃并重新启动节点
  • E 系列报告光纤通道错误 
  • 性能极低
    • 报告的 VOL/ LUN 延迟极高或 " 不可用 "
  • 一个端口 "Disk device 0z .1L00" 出现 SCSI 传输错误
  • 节点遇到较长的一致点( CP )
示例 EMS 消息:
WAFL hung for <node>. in SK process wafl_exempt07 on release 9.6P5
ERROR  scsi.cmd.transportErrorEMSOnly: Disk device : Transport error during execution of command: HA status
wafl.cp.toolong: Aggregate xyz experienced a long CP
mlm.non.optimized.TPusage: Detected non-optimized usage of a array's target port
cf.multidisk.fatalProblem:info]: Node encountered a multidisk error or other fatal error while waiting to be taken over
"Host-side: controller in slot B, port <port>: Fiber channel link errors - threshold exceeded"

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.