跳转到主内容

所有节点均无法完成切换操作

Views:
1
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用场景

  • 延伸型 MetroCluster
  • MCC – IP
  • ONTAP 9

问题描述

  • 延伸型 MetroCluster 双节点中的一个节点发生电源故障。
  • 执行切换操作的另一个节点在切换操作期间崩溃,并显示一条错误消息。
    • 示例:

PANIC: Msg execution failed during replay, vol=example_vol, msg=0xfffff70082f894a0, type=WAFL_SPINNP_WAFFI_PUNCH_HOLES, errno=45, replay_idx=383, coalesced=0 coalesced_cnt=0 in SK process ReplayThr_03 on release 9.8P4 (C) on Wed Jul 21 07:11:36 CEST 2021

  • MetroCluster 切换到另一站点失败,可能会导致数据中断。
  • 的输出显示了一条错误消息 metrocluster operation history show
    • 示例:

Failed to execute the switchover operation for the node components.

Node01 (fatal): None of the nodes were able to complete the switchover operation;
aborting the operation for cluster components

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.