跳转到主内容

在 FCVI 更换后,开关被否决

Views:
32
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

 

适用于

在此处添加您的文本。

问题

已在两个节点 MetroCluster 中的一个中更换了 FCVI 卡。 

尝试重新切换失败并显示错误消息:
Errors: Failed to validate the node and cluster components before the switchback operation.
node1 (non-overridable veto): Failed to read DR partner state. Verify that the Fibre Channel interconnect is up and retry the operation.

clustera-01 (接管 clustera-02 )在 "etrrocluster interconnect adapter show" 的输出中没有地址

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.