跳转到主内容

在机头交换过程中无法执行切回

Views:
22
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster
Last Updated:

适用于

  • 双节点 MetroCluster 机头升级
  • 从 AFF8040 到 AFF300
  • 切换状态

问题

在升级第一个节点期间,无法执行 MetroCluster 切回

Failed to validate the node and cluster components before the switchback operation.
(non-overridable veto): The DR partner is not ready for the switchback

MetroCluster node show 报告新节点处于正常状态,而不是等待切回

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device

 

  • 这篇文章对您有帮助吗?