无法在切回操作之前验证节点和集群组件
适用场景
- 光纤 MetroCluster
- 光纤通道虚拟接口(FC-VI)
问题描述
- 将MetroCluster 的一个站点迁移到新位置
- 后端交换机的布线和配置不正确
- 即使FCVI适配器和互连连接处于正常状态、也无法执行切回并显示以下错误消息
clusterB::*> metrocluster operation show
Operation: switchback-simulate
State: failed
Start Time: 7/16/2022 05:50:58
End Time: 7/16/2022 05:51:14
Errors: Failed to validate the node and cluster components before the switchback operation.
zongbunas::clusterB-02 (non-overridable veto): Failed to read DR partner state. Verify that the Fibre Channel interconnect is up and retry the operation.
zongbunas::clusterB-01 (non-overridable veto): Failed to read DR partner state. Verify that the Fibre Channel interconnect is up and retry the operation.