跳转到主内容

无法在切回操作之前验证节点和集群组件

Views:
1
Visibility:
Public
Votes:
0
Category:
metrocluster
Specialty:
metrocluster<a>FCVI</a><a>切回</a><a>2009238918</a><a>进行转换</a>
Last Updated:

适用场景

  • 光纤 MetroCluster
  • 光纤通道虚拟接口(FC-VI)

问题描述

  1. 将MetroCluster 的一个站点迁移到新位置
  2. 后端交换机的布线和配置不正确
  3. 即使FCVI适配器和互连连接处于正常状态、也无法执行切回并显示以下错误消息
clusterB::*> metrocluster operation show
Operation: switchback-simulate
State: failed
Start Time: 7/16/2022 05:50:58
End Time: 7/16/2022 05:51:14
Errors: Failed to validate the node and cluster components before the switchback operation.
zongbunas::clusterB-02 (non-overridable veto): Failed to read DR partner state. Verify that the Fibre Channel interconnect is up and retry the operation.
zongbunas::clusterB-01 (non-overridable veto): Failed to read DR partner state. Verify that the Fibre Channel interconnect is up and retry the operation.

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.