跳转到主内容

Active IQ Unified Manager 事件 " 节点到 FC 交换机所有 FC-Initiator 链路已关闭 " 和 " 节点到 FC 交换机所有 FC-VI 互连链路已关闭 "

Views:
11
Visibility:
Public
Votes:
2
Category:
oncommand-unified-manager
Specialty:
om
Last Updated:

适用场景

  • Active IQ Unified Manager
  • OnCommand Unified Manager 9.5 (及以下)
  • MetroCluster 配置中的 ONTAP 8.3 及更高版本

问题描述

  • Unified Manager 中的 MetroCluster 事件在解决后不会过时
  • 这些事件包括但不限于以下内容:

Node To FC Switch All FC-Initiator Links Down
Node To FC Switch All FC-VI Interconnect Links Down

  • 在将事件标记为已解决后,可能会创建这些实例的新实例,但集群和 MetroCluster 网络结构设备上未发现或已修复相关情况。

 

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

NetApp provides no representations or warranties regarding the accuracy or reliability or serviceability of any information or recommendations provided in this publication or with respect to any results that may be obtained by the use of the information or observance of any recommendations provided herein. The information in this document is distributed AS IS and the use of this information or the implementation of any recommendations or techniques herein is a customer's responsibility and depends on the customer's ability to evaluate and integrate them into the customer's operational environment. This document and the information contained herein may be used solely in connection with the NetApp products discussed in this document.