跳转到主内容

从 9.6 到 9.8 的 AIQUM 之后, OCIE 服务无法启动

Views:
1
Visibility:
Public
Votes:
0
Category:
active-iq-unified-manager
Specialty:
om
Last Updated:

适用场景

在 Redhat Linux ( AIQUM )上, ActiveIQ Unified Manager 9.6x 升级到 9.8x

问题描述

  • 升级后, OCIE 无法启动
  • 中出现错误 /var/log/ocie/server.log:

2021-11-10 13:36:31,556 ERROR [org.jboss.as.controller.management-operation] (Controller Boot Thread) WFLYCTL0013: Operation ("add") failed - address: ([
   ("subsystem" =>"elytron"),
   ("key-store" =>"ServerKeyStore")
]) - failure description: {"WFLYCTL0080: Failed services" => {"org.wildfly.security.key-store.ServerKeyStore" =>"WFLYELY00004: Unable to start the service.
   Caused by: java.io.IOException: Keystore was tampered with, or password was incorrect
   Caused by: java.security.UnrecoverableKeyException: Password verification failed"}}
...
   Caused by: java.lang.IllegalStateException: org.jboss.msc.service.StartException in anonymous service: WFLYDM0018: Unable to start service
   Caused by: org.jboss.msc.service.StartException in anonymous service: WFLYDM0018: Unable to start service
   Caused by: java.io.IOException: Keystore was tampered with, or password was incorrect
   Caused by: java.security.UnrecoverableKeyException: Password verification failed"}}

Sign in to view the entire content of this KB article.

New to NetApp?

Learn more about our award-winning Support

Scan to view the article on your device